Purchase on account

Extended payment terms up to 120 days

Art. no. 662820000

SYR Filling Combination BA 6628, DN20 with thermal insulation shell, made of pressed brass

  • High-quality materials
  • Fast and secure shipping
  • Easy 30-day returns
  • Purchase on account: 120-day payment terms
Quantity/Size:
Regular price 174,99 €
incl. VAT - Shipping calculated at checkout
In stock 125 pcs. available
Purchase on account120-day payment terms
Expert supportMon-Fri 7:00 AM - 6:00 PM
SYR Filling Combination BA 6628, DN20 with thermal insulation shell, made of pressed brass
SYR Filling Combination BA 6628, DN20 with thermal insulation shell, made of pressed brass
174,99 €

The FüllCombi BA 6628 is used for the automatic filling and refilling of hot water central heating systems in accordance with DIN EN 12828. According to DIN EN 1717, it is permanently connected to the drinking water pipe. If the supply pressure falls below the pressure of the heating system during the filling process, the BA backflow preventer (approved up to and including fluid category 4) integrated in the FüllCombi prevents the heating water from flowing back into the drinking water pipe. Even heating water with inhibitors (corrosion and antifreeze agents) can be permanently connected to the drinking water installation with the help of the FüllCombi BA, thus eliminating the previously common hose connection. After the filling process, the shut-off of the FüllCombi BA should be closed again for safety reasons.
The FüllCombi BA 6628 consists of a shut-off valve, pressure reducer, manometer, BA backflow preventer and waste water connection. It thus contains all components for standard-compliant filling of a heating system.
Technical data:
Operating pressure: max. 10 bar
Operating temperature: max. 30 °C (inlet), max. 65 °C (outlet)
Installation position: horizontal, funnel connection downwards
Outlet pressure: 0.5 - 4 bar (factory setting: 1.5 bar)
Medium: Drinking water
Filling capacity: 1.35 m³/h at ?p 1.5 bar.
Connection size: DN 20
Purchase on account

Payment terms of up to 120 days

Construction Site Express

Directly to your address

Brand quality

1,200+ manufacturers

Expert support

Mon-Fri 7:00 AM - 6:00 PM